grade-4.jpg (45643 bytes)

Switchtender R. A. Moody Cleans switch points lined for the Heavily sanded rails of Safety Track 1, which he clears for main once the engineer of the Mountain type on No 20 sounds a long, a short, and a long to indicate that his train is under control.

grade-5.jpg (68238 bytes)

The Upper Safety Track No. 2